·Through IATF16949 certification on 2018.01.23 | [2018/4/8] | |
·Plating Factory is established in 2017.11 | [2018/1/2] | |
·obtain patents and filing a national patent office in 2016.1 | [2017/12/25] | |
·The factory moved to Liaobu town, Dongguan city | [2017/12/23] | |
·Metal stamping department is established in 2015.11 | [2017/12/20] | |
·Through UL certification in Dec.2014 | [2015/10/7] | |
·Connector | [2015/9/28] | |
·Mannufacture the medical product for Wurth Midcom | [2015/9/28] | |
·Manufacture the auto parts according to TS16949 standard | [2015/9/25] | |
·ISO9001:2008 certification | [2015/9/24] | |